Shot List # Reel 3, Slate 07sec: September 30, 1967, Take 1-9A. An officer, Captain Pemmy (P. Pemmy), briefs beside a Military Demarcation Line sign and a map. This officer is Lieutenant Colonel Cloninger, explaining the Paju DMZ area. The footage is silent with no audio. # Reel 4, Slate 11min08sec: The DMZ panorama is visible. A vehicle speeds through. (12min24sec) Y-shaped wire fence construction underway in the DMZ. Guard posts and U.S. forces supervising the work on the hillside below. # Reel 9, Slate 13min16sec: October 3, 1967 — a helicopter shows the DMZ area. (13min40sec) Ohio Hill and Mazie forward guard post are shown. Bases are visible below. (14min12sec) The Paju plain and Freedom Bridge (Imjin River railway bridge) are visible in the distance. # 15min: Scene change — Panmunjom and Joint Security Area panorama are visible. (15min52sec) Wire fence installed along the DMZ. All are Y-shaped wire fences. The fence follows the mountain ridgeline. (16min56sec) Wire fence installation on Hill 216. # 20min20sec: Scene change — the Imjin River is visible. The Imjin River railway bridge and a destroyed bridge pier are visible.
Description
Description
Title
DMZ and Paju Overview from Helicopter (Wire Fence, Guard Post, Railway Bridge)