Browse Archive

Browse Paths

Follow the collection paths to move through the archive or jump into search.

Item Detail

Repair Work on Paju Freedom Bridge (Imjin Railway Bridge)

Shot list

video

Preview

Media

Back to list
Shot List # 1 Roll, Slate, 02sec: Workers erect bridge piers beneath the Freedom Bridge; a crane transports pier components. # 2 Roll, Slate, 1min05sec: Bridge piers are being erected. Korean civilian workers are performing the pier construction. # 3 Roll, Slate, 2min18sec: The Freedom Bridge is visible. Pier construction continues. # 4 Roll, Slate, 3min19sec: New pier construction continues alongside the Freedom Bridge. Boats are used to move pier beams. The Freedom Bridge, already destroyed by bombing, is visible. # 5 Roll, Slate, 4min22sec: Beams are transported using multiple rubber boats. A crane lifts beams into position. # 7 Roll, Slate, 6min39sec: Additional beams are lifted into place by crane. Destroyed remnants of the Freedom Bridge's other piers are visible nearby. # 8 Roll, Slate, 7min43sec: Pier construction continues. # 9 Roll, Slate, 8min46sec: A U.S. forces technician supervises from atop the crane. # 10 Roll, Slate, 9min53sec: The crane erects a large pier beam. The camera pans to the destroyed original bridge.

Description

Description

Title
Repair Work on Paju Freedom Bridge (Imjin Railway Bridge)
Date
1952-10-14 00:00:00 +0000 UTC
Description
Shot list